Green Space is proud to introduce our team of Spider-Men, consisting of 18 members meticulously selected for their high level of expertise and robust health, enabling them to scale heights effortlessly. Combined with rigorous training in safe rope techniques as per the labor safety regulations set by the Ministry of Labor, War Invalids and Social Affairs.
Our Spider-Men team is committed to assisting customers with a wide range of services at any height, including cleaning exterior glass walls, painting, applying anti-glare film to windows, decorative installations, or dismantling tasks…
Safety Equipment Solutions to Ensure Spider-Man’s Efficiency in Service Delivery to Customers
- Regular health check-ups for Spider-Men
- Purchase 24/7 accident insurance for Spider-Men
- Provide personal protective equipment
- Inspect and certify safety ropes and harnesses
- Secure safety hooks
- Certificates for working at heights
- Purchase liability insurance for customer compensation

Situations may araise
SCENARIO 1: If the safety rope breaks during work
- In this case, there is still a second safety rope to prevent the worker from falling
- Cease work immediately
- Utilize the second safety rope to descend to the ground
- Replace the broken rope with a new one and repeat the initial procedure
SCENARIO 2: If unfavorable weather conditions such as rain or strong winds occur during work
- Stop the work
- Lower the safety rope to the ground
- Secure the rope
- Resume work only when weather conditions improve
SCENARIO 3: If tools or equipment fall during work
- All tools and equipment must be securely tethered to the safety belt to prevent them from falling to the ground
- The area below the work zone must be marked with warning signs to prevent entry
Safety Harnessing Procedure

Step 1:
- Prepare a complete set of safety harness equipment for one person.
- Erect safety warning lines around the elevated work area.

Step 2:
- Observe the surroundings carefully and report any abnormalities immediately to the supervising authority for prompt action.

Step 3:
- Secure the harness rope to a fixed anchor ensuring a load capacity of 500kg or more.
- Use a second safety rope anchored similarly to serve as a backup.
- Attach the sitting harness to the first safety rope.
- Then wear the safety belt and sit on the harness.

Step 4:
- Perform a final safety check and commence work upon confirming safety.

Step 5:
- At the end of the day’s work, after touching the ground, secure the ropes firmly.